The 30-day Sprint

Week by week, what the implementation sprint ships, what we need from you, and what lands at the end.

The Sprint takes the audit's ranked fix list and ships it. Everything lands as concrete, reviewable changes; nothing goes live without your approval.

Week 1: technical and schema

Crawler access, Bing verification and IndexNow, JSON-LD deployment. Everything here ships as concrete diffs you can review.

Week 2: content assets

Three citation-ready assets in extractable form (FAQ blocks, comparison tables, direct-answer sections), drafted for your approval.

Week 3: entity and citations

Wikidata and sameAs work, plus one press release submitted to five vertical publications in your category.

Week 4: buffer and delivery

Loose ends, indexing lag, and the delivery packet: everything shipped, linked, and documented.

Day 30: verification

Every query from your audit re-run: same prompts, same engines. You get the before/after, side by side. See Re-run verification for exactly what the delta report contains.

On this page