The 30-day Sprint
Week by week, what the implementation sprint ships, what we need from you, and what lands at the end.
The Sprint takes the audit's ranked fix list and ships it. Everything lands as concrete, reviewable changes; nothing goes live without your approval.
Week 1: technical and schema
Crawler access, Bing verification and IndexNow, JSON-LD deployment. Everything here ships as concrete diffs you can review.
Week 2: content assets
Three citation-ready assets in extractable form (FAQ blocks, comparison tables, direct-answer sections), drafted for your approval.
Week 3: entity and citations
Wikidata and sameAs work, plus one press release submitted to five vertical publications in your category.
Week 4: buffer and delivery
Loose ends, indexing lag, and the delivery packet: everything shipped, linked, and documented.
Day 30: verification
Every query from your audit re-run: same prompts, same engines. You get the before/after, side by side. See Re-run verification for exactly what the delta report contains.